Management scheme Electroplating equipment What key links must be paid attention to in? The electroplating equipment management plan is the basis for the production and manufacturing of electroplating enterprises. The purpose of the electroplating equipment management plan is to use mechanical equipment more effectively and economically, make full use of the best economic benefits, reduce mechanical failures and ensure rapid repair. If many advanced equipment cannot fully use the necessary function of smoothness and high efficiency, the important reason is that the mechanical equipment lacks regular maintenance, stains and corrosion, and the "sharp edge" of mechanical equipment will become "blunt blade", and the culprit is the outdated management system of electroplating equipment.
What key links must be paid attention to in the management plan of electroplating equipment? The management of electroplating equipment is a very important link in the work of electroplating, and try to pay attention to the key link in the management plan. So, what key links must be paid attention to in the management plan of electroplating equipment? Let's get to know.
1. General requirements for mechanical equipment: complete prefabricated components, positive sound, sufficient driving force, flexible instrument panel in the vehicle, and complete raw materials.
2. "Cross course content" of mechanical equipment maintenance: cleaning, lubrication, adjustment, tightening, corrosion resistance.
3. The "Four Understandings and Three Skills" that the operators should have:
Four understandings: understand the basic concept, structure, function and scope of application. Three skills: be able to use, repair and maintenance, and fault test.
4. The "four fixations" for the use of machinery and equipment: fixed post and responsibility, fixed machine, fixed post and fixed track system.
5. Four requirements for equipment maintenance and management: clean environment, cleaning, lubrication and safety factor.
6. "Three good" of equipment maintenance management: manage, use and repair mechanical equipment.
7. In the process of equipment maintenance and management, "two eyes can't see the sky; three eyes can't stand": two eyes can't see the sky: adding natural materials can't see the sky; The cleaned precision machined parts are invisible. Three non vertical: non vertical of natural materials, parts and tools.
8. "Three inspection system" of mechanical equipment inspection: self correction and self inspection, mutual inspection and post inspection.
9. The "three inspection system" applied to circulating machinery and equipment: honest inspection before transporting things, essential parking inspection on the way, and multi-directional inspection after returning to the site.
10. Safety production accidents of machinery and equipment: those whose accuracy, function, load are reduced or production is stopped due to abnormal damage of machinery and equipment, and whose internal injuries are worrying because the surface is not damaged.
11. The "Three Don'ts" of preparing for safety accidents: Never let go of unclear safety accident analysis; The person responsible for the accident and the public will never let it go without education; Never let it go without preventive measures.
12. "Five fixations" of edible oil for machinery and equipment: fixed post and responsibility, specific, punctual, customized and qualitative analysis.
13. "Three filtration" of lubricating grease: the first filtration shall be carried out before releasing the storage tank; The second filtering device shall be installed at the inlet of steam oil drum and machine oil drum; The third filtering device shall be set at the side of the oil filling and dripping port of the machine equipment.
14. The "four closed" type of lubricating grease (grease): closed filtering, closed transportation, closed adding, and closed storage.
15. The requirements for completing the record: immediately, properly, completely, clean-up and tidiness.